We set the bar very high in our company. We want to be the best in the eyes of our customers. Therefore, we are constantly modernising and improving our Galvanizing Plants, using the best technology available at the time, constantly bearing in mind also environmental protection.

2020 FAM Oborniki – start-up of a high-temperature zinc plating line with centrifugation.

A line for high-temperature zinc plating with centrifugation was put into operation. In addition, internal transport was modernized by installing a winch system (12 units). Two overhead cranes were replaced, one each at forming and demoulding.


2020 Fam Opole – installation of new process tubs and platforms

In 2019/2020, the installation of new process tubs and platforms was carried out at the Fam Opole Plant. We built the etching plant including the installation of gas extraction. In addition, the traverse feed and collection system was put into operation, the furnace gas and air system was replaced and the filling and mixing system […]


2019 Fam Opole – replacing the dryer with a new three-chambered one

The old two-chamber dryer was replaced with a three-chamber dryer with a much higher capacity. The substructure of the production hall was blasted and repainted and a new façade installed.


2019 Fam Wieluń – investments were carried out

In 2019, we carried out the following investments at the Fam Wieluń Plant: installation of a fabric filter and equipping the cranes with new winches.


2018 FAM Wroclaw – new production hall

Addition of an additional aisle to the production hall (increasing the storage area and opening of additional demoulding stations).


2018 FAM Opole – acid tank

The work consisted of commissioning the new acid tanks


2017 FAM Wieluń – commissioning of finished goods warehouse, replacement of three process tubs

A finished goods warehouse measuring 50x15m and a waste and spare parts warehouse measuring 15x10m were commissioned. In addition, three process tubs and all platforms were replaced. A new absorber with fans was installed and the old chimney and gas extraction system from the process tubs were dismantled. 


2016 FAM Wieluń – new façade and yard

This year at FAM Wieluń the facade of the production hall was replaced with a new one, and the entire area where our Galvanizing Plant is located was paved.